Case Studies

Case Study 1 – HMS OCEAN

Client: UK MoD
Completion: 2008/2010
Scope: ST150 operating on HMS Ocean   

2 years of extensive testing was undertaken by MoD. 

Requirement to process 120kg per hour of waste was surpassed. 

Processed a wide range of waste streams from food waste to oil sludges.

Very high availability throughout normal operation. 

Average 7% char residue. 

Ongoing product support and enhancement since 2011.     

Case Study 2 – US ARMY

Client: US ARMY
Completion: 2011
Scope: ST150 for Land Forces/FOB
  

Containerized unit for US Army 1,000tpa mixed waste.
Power Generation 2 x ISO containers (20 x 8 x 8ft) positioned and then bolted together.
Minimal Infrastructure.
Ideal for remote locations and increased mobility.   

Case Study 3 – INDUSTRIAL WASTE

Client: Confidential
Completion: April 2017
Scope: On-site industrial waste   


Following several months technical due diligence, a unit was installed in a factory to destroy old product and recover elements for re-use.  
Currently located in Leicestershire.  